EMC D-PSC-MN-23 Exam Syllabus Topics:
| Section | Weight | Objectives |
|---|---|---|
| PowerScale Implementation | 28% | - Configuration tools and methods - Joining nodes to a cluster - Creating a new cluster |
| PowerScale Hardware Installation | 24% | - Installation planning - Site preparation steps - Rack and subcomponent installation - Correct cabling procedures |
| PowerScale Hardware Maintenance | 24% | - Preliminary tasks for hardware maintenance - Preparing nodes for operation - Installing and maintaining FRUs - Installing and maintaining CRUs |
| PowerScale Hardware Concepts | 24% | - Installation methods, tools and considerations - Cluster management tools usage (WebUI, CLI, Serial Console, PAPI) - Networking requirements and setup - PowerScale Gen 6/6.5 design and capabilities |
EMC Dell PowerScale Maintenance 2023 Sample Questions:
Question #1
A platform engineer is unable to join a Dell PowerScale node to an existing SmartLock compliance mode cluster.
What is the reason for this issue?
A. Node was not rebooted into compliance mode before trying to join.
B. Node is a Gen 6 node, which is not compatible with compliance mode.
C. Node is an F-series node, which is not compatible with compliance mode.
D. OneFS version of the existing cluster is 6.
Question #2
When integrating PowerScale with cloud environments, what factors need to be considered for data tiering?
A. Cloud storage costs
B. Data access frequency
C. Bandwidth limitations
D. Compliance requirements
Question #3
A Dell PowerScale Gen 6 chassis is being installed. The chassis has been aligned with the rails.
What is the correct order of steps to finish the installation?
A. 1. Secure the lift casters on the floor.
2. Slide the first few inches of the back of the chassis onto the supporting ledge of the rails.
3. Release the lift casters and carefully slide the chassis into the cabinet as far as the lift allows.
4. Push the node off the lift arms and into the rack.
5. Install two mounting screws at the top and bottom of each rail to secure the chassis to the rack.
B. 1. Push the node off the lift arms and into the rack.
2. Release the lift casters and carefully slide the chassis into the cabinet as far as the lift allows.
3. Install two mounting screws at the top and bottom of each rail to secure the chassis to the rack.
4. Slide the first few inches of the back of the chassis onto the supporting ledge of the rails.
5. Secure the lift casters on the floor.
C. 1. Install two mounting screws at the top and bottom of each rail to secure the chassis to the rack.
2. Release the lift casters and carefully slide the chassis into the cabinet as far as the lift allows.
3. Secure the lift casters on the floor.
4. Slide the first few inches of the back of the chassis onto the supporting ledge of the rails.
5. Push the node off the lift arms and into the rack.
D. 1. Release the lift casters and carefully slide the chassis into the cabinet as far as the lift allows.
2. Push the node off the lift arms and into the rack.
3. Install two mounting screws at the top and bottom of each rail to secure the chassis to the rack.
4. Slide the first few inches of the back of the chassis onto the supporting ledge of the rails.
5. Secure the lift casters on the floor.
Question #4
Before performing hardware maintenance on a PowerScale node, why is it important to document the existing cabling setup?
A. To ensure cables can be reconnected correctly
B. To maintain airflow management
C. To identify potential cable degradation
D. To facilitate future upgrades
Question #5
When cabling nodes, what practices should be followed to ensure a successful PowerScale installation? (Select two)
A. Using cables of standardized lengths to reduce clutter
B. Testing each cable for connectivity and signal integrity
C. Implementing structured cabling that adheres to industry standards
D. Labeling each cable according to its connection points
Solutions:
| Question #1 Correct Answer: A | Question #2 Correct Answer: A,B | Question #3 Correct Answer: A | Question #4 Correct Answer: A | Question #5 Correct Answer: B,D |














987 Customer Reviews
Quality and ValueITCertKing Practice Exams are written to the highest standards of technical accuracy, using only certified subject matter experts and published authors for development - no all study materials.
Tested and ApprovedWe are committed to the process of vendor and third party approvals. We believe professionals and executives alike deserve the confidence of quality coverage these authorizations provide.
Easy to PassIf you prepare for the exams using our ITCertKing testing engine, It is easy to succeed for all certifications in the first attempt. You don't have to deal with all dumps or any free torrent / rapidshare all stuff.
Try Before BuyITCertKing offers free demo of each product. You can check out the interface, question quality and usability of our practice exams before you decide to buy.